Skip to content
A product of DomConsult

Migration

A migration path, not a leap.

Moving a housing portfolio to a new system is a project with history attached: decades of contracts, ledgers and documents. GRANOS migrations follow a staged path with test runs and a parallel phase, so the cutover is a decision – not a surprise.

Starting points

Where customers typically come from

The path is the same; the mapping effort differs. We have seen these three starting points most often.

XEIDOX-generation and other legacy housing systems

Established data models with known structures. Master data, contracts and account histories map well; custom fields and reports need review.

General ERP or accounting packages

Strong finance, weak housing semantics. Units, contracts and allocation logic are often rebuilt from spreadsheets and documents.

Spreadsheets, documents and partial tools

Smaller organisations and new entities. The migration doubles as a data clean-up and a first consistent portfolio record.

Typical phases

From assessment to hypercare

Every migration runs through the same phases. Scope and pace are agreed per project; nothing moves to the next phase without a documented sign-off.

  1. Assessment

    We inventory systems, data volumes, interfaces and reports, and agree what is migrated, archived or retired.

    DeliverableScope and migration plan

  2. Data mapping

    Source fields are mapped to the GRANOS model; rules for transformation, defaults and exceptions are written down and reviewed with your key users.

    DeliverableMapping specification

  3. Test migrations

    Repeated automated loads into a test tenant. Each run produces reconciliation reports – counts, balances, sample checks – until the results are clean.

    DeliverableReconciliation reports

  4. Parallel run

    Selected processes run in both systems for a defined period. Differences are analysed and fixed at the source or in the mapping.

    DeliverableParallel-run protocol

  5. Cutover

    Final load at an agreed point, typically a period end. Legacy write access is closed, portals and interfaces are switched.

    DeliverableCutover checklist and sign-off

  6. Hypercare

    Intensified support after go-live: daily check-ins, prioritised fixes and open-issue tracking until the first critical cycles have run.

    DeliverableClosed issue list

What is migrated

Data groups and how we treat them

Not everything should move. For each group we agree: migrate, archive read-only, or retire.

Master data

  • Buildings, units and equipment
  • Tenants, owners, members and contacts
  • Contractors and suppliers
  • Cost types, keys and meters

Contracts and balances

  • Tenancy and ownership contracts
  • Rent schedules and advance payments
  • Open items and account balances
  • Deposits, funds and reserves

Finance and history

  • Opening balances per cutover date
  • Account history for agreed periods
  • Statement history where required
  • Historical allocation keys

Documents

  • Contracts and correspondence
  • Invoices and accounting documents
  • Statements and protocols
  • Plans and technical documentation

Risk controls

How we keep the migration safe

Reconciliation on every run

Record counts, balance totals and sampled records are compared automatically after each test load and documented.

Repeatable, scripted loads

No manual data edits in transit. Every load is scripted so results are reproducible and corrections happen at the source or in the mapping.

Legacy stays readable

The old system or an archive remains available read-only after cutover, so nothing has to be migrated under pressure.

Clear roles and sign-offs

Each phase has named owners on both sides and a documented acceptance step before the next phase starts.

Division of labour

Who does what

Durations, effort and pricing of a migration depend on sources, data quality and scope. We provide an estimate after the assessment – not before.

Services at DomConsult
GRANOS
Project lead for the migration, mapping, tooling, loads, reconciliation reports, training
Your key users
Field-level decisions, exception rules, acceptance tests, parallel-run checks
Your IT
Source exports, interfaces, identity (SSO), network and cutover window
Legacy vendor (if involved)
Exports in agreed formats, read-only access after cutover

Start with an assessment

Bring your current system landscape; we will outline a path and the open questions.